At O2, we don't just deliver projects, we refine them. With decades of hands-on experience, our team brings deep technical knowledge, practical field expertise, and a sharp commercial mindset to every project.

​We believe that no two projects are alike and that’s what drives us. We’re passionate about fine-tuning each project to align with its unique geology, objectives, stakeholders, and constraints. Whether we’re supporting feasibility studies, operational ramp-ups, or full project execution, our focus is on crafting fit-for-purpose solutions that set projects up for lasting success.

From concept to closure and all stages in between, we work closely with our clients to anticipate challenges, adapt quickly, and deliver with purpose because when a project succeeds, so do the communities and industries it supports.

Ovoot Coking Coal Project

Aspire Mining - Mongolia
Ovoot Coking Coal Project is under development and owned by Aspire Limited, located in Khuvsgul Aimag, Mongolia. O2 Mining has been providing consulting services to Aspire for development of this project since 2017.

Study Ovoot Phase 1, 2 & 3, PFS Update
Through our subsidiary, we completed an international standard pre-feasibility study announced by Aspire to the ASX in 2019.
​
​Erdenet Rail Terminal Design 
​​Later O2 was engaged by Aspire to design the Erdenet Rail Terminal for transhipment of coal from road train trucks into a coal storage facility, where coal is reclaimed and further loaded onto trains at a rate of up to 10 mtpa and this work was successfully completed in 2022.  In 2024 O2 updated the ERT design to accommodate a new Phase 1 to Phase 2 expansion plan. 
​​
Picture
Picture
BED for Transport Hub and Offsite Infrastructure 
​In 2024 O2 was engaged to provide consulting services, including the preparation of an international standard design and cost estimate for the transportation hub and offsite infrastructure to support Aspire’s Ovoot Coking Coal project. Services comprised Basic Engineering Design for two truck rest stops strategically located along the transport route and a central transportation hub designed to support efficient and productive trucking operation. The transportation hub will serve as the centralised base for all trucking activity including routine inspections, scheduled preventative, maintenance, major overhauls, tyre changing and refuelling.
Picture
Picture
Aspire Mining – DED for OCCP Camp and Mine Infrastructure Area 
In 2024 O2 was engaged to provide detailed engineering design for the Ovoot permanent camp. In the ongoing OCCP Camp scope, O2 Mining is responsible for developing the detailed engineering design for a consolidated camp that accommodates essential facilities for all site-based personnel. Our design integrates sustainable solutions to enhance energy efficiency and operational performance, while ensuring compliance with both local Mongolian standards and international requirements. Through structured project management and regular stakeholder reviews, our team is ensuring that the camp layout remains flexible and expandable, providing a seamless integration with the broader mine infrastructure area and setting a robust foundation for future developments. 
Picture
We are proud to be contributing our expertise to the Ovoot Coking Coal Project. This project aligns with our commitment to supporting sustainable resource development and delivering value through tailored engineering, project management, and operational solutions. Working alongside our partners, we are helping to unlock the full potential of Ovoot while ensuring the highest standards of safety, community engagement, and environmental responsibility.

Kharmagtai Gold Copper Project

Xanadu Mines - Mongolia
​Kharmagtai is a world-class, 30-year copper-gold mine in the South Gobi region of Mongolia that is under development by Xanadu Mines with investment and support from Zijin Mining. In 2022 O2 Mining was engaged to provide elements of the PEA with a focus on non-process infrastructure. Later O2 delivered an update to the PEA as being the overall QP for the work. In 2023 O2 commenced overall study management of the PFS. O2 created added value with introduction and execution and execution of CIL plant design, adding a further $120M to NPV and increasing IRR by 1.2% to bring in a further 8% of total gold recovery for the project.  
​
​O2 also played a key role in the project's implementation strategy, including the Project Execution Plan (PEP) and Operational Readiness Plan (ORP). Additionally, O2 contributed to the business and financial aspects of the study, including the development of the financial model for the PFS.
 

You can see the Kharmagtai Fly Through here. 
Picture
We provided turnkey air quality monitoring station solutions for the Kharmagtai Copper Gold Project at the project site.  Incorporating air quality monitoring during the project design phase is essential for identifying potential environmental and health risks early. It allows project teams to establish baseline conditions, predict impacts, and integrate effective mitigation measures into the design. This proactive approach ensures compliance with regulations, protects local communities and ecosystems, and supports sustainable, responsible development from the outset.​
Picture
Designing with clean air in mind means building responsibly from the ground up, protecting people, communities, and the environment before the first
​shovel hits the ground.
Air-quality icons created by Ida Desi Mariana - FlaticonPicture
Picture

Bayan Khundii Gold Project

Erdene Resources Development - Mongolia
Bayan Khundii Gold Project, under development by Erdene Resources, is located in in Bayankhongor Aimag, Mongolia. O2 Mining has been engaged to provide expertise in the development of their mining properties in Mongolia, such as delivery of strong PEA in Feb 2019, PFS in October 2019, and BFS in July 2020 with subsequent update of the BFS in 2023 and supported ERD in the preparation for construction through to current. O2 have completed FEED, FS and DED design of the Process and Non-Process Infrastructure working with International and local Mongolian consultants  in line with construction permitting requirements in Mongolia and International Standards. We continue to proudly support the Bayan Khundii Gold Project with a Process Expert during construction and commissioning of the Process Plant. 
Design Render of Mine Site and Buildings for Bayan Khundii Gold Project
Bayan Khundii Project Conceptual Design Render


O2 Mining installed two automated TSI Air Quality Monitors at the Bayan Khundii Project in partnership with Erdene Resource Development Corp. and its Mongolian subsidiary. These monitors provide real-time data to support dust suppression efforts and form the foundation for a robust Air Quality Management Plan, as part of the site’s Detailed Environmental Impact Assessment.
Local labour was engaged for the installation, fostering community involvement and raising awareness around air quality monitoring. The advanced TSI system measures PM1, PM2.5, PM10, total particulate matter, and gases including CO₂, CO, NO, and NO₂. This real-time data enables proactive risk management and enhances safety for workers and nearby communities.
This installation reflects O2 and Erdene’s strong commitment to environmental stewardship and opens the door for participatory monitoring to promote transparency and informed community dialogue.
Picture
Picture
Picture

Alluvial Gold Project

ODOD Gold Project - Mongolia
In 2019, O2 Mining subsidiary, SES Resources LLC secured an alluvial gold operations contract in Bayankhongor Province.  We were able to mobilise only a few weeks after contract award, develop access into and set up a new site, and commence production.  Mid season we finished mining on the first license and demobilised the camp and relocated to another license and commenced operations where we stayed through to the end of the season.  By the end of the season, through our dedication and innovation, we had helped our client increase production threefold.  And we achieved this without any recordable injuries (medical treatments or lost time injuries).  We are exceptionally proud of what the team was able to achieve during the production season. 
Picture
SES Site Team ready for work
Picture
ODOD Gold Project

Chuluut International

Jonsh Tolgoi Project - Mongolia
O2 Mining has invested in a fluorspar project with Eurokhan and Chuluut International.  We mobilised a team to refurbish existing equipment in the processing plant, assess conditions of the existing foundations and equipment, pull down the plant, re-design the processing plant to improve the efficiency of production, procure all new equipment to re-build and substantially complete all foundations for the installation of the new equipment.  We ended the 2019 year with no recordable injuries, a great result given the complex and ever changing operations that were undertaken at the project site.  

Blair Athol Coal Mine, Australia

Central Queensland - Australia
Blair Athol Coal Project was purchased by
TerraCom Australia and recommenced operations in 2017.  O2 Mining was engaged to lead the Australian business unit through design, construction and commissioning of a 5km rail spur and loading facility and lead the operations from 1mtpa to 2.6mtpa production and sales.
Picture
Dragline and Excavator

 CHPP Operations and Support

Tellus Commoddities - Mongolia & China
​Tellus commodities engaged O2 Mining to undertake marketing as well as CHPP operations and support activities in northern China throughout 2015.  We provided marketing adn coal processing professionals who a
chieved significant premium for hard coking coal product  for our client,  5% improvement in overall product yield through the processing plant and reduced overall coal losses in the supply chain by 2%.

Picture
Transporting Coal

Koktenkol

Dala Mining LLP - Kazakhstan
​Koktenkol is a large Molybdenum, Bismuth, and Tungsten project located in the Dzhezkazgan Area mining district in central Kazakhstan. O2 Mining was engaged through 2013 and 2014 to provide consulting services to Dala in the form of preparation and defence of multiple mining studies which resulted in investment from Itochu Resources of Japan. O2 Mining improved the NPV of the project by US$126M by revision to the mining approach and supported the client through repeat contracts resulting in the client securing equity from Itochu, a large Japanese trading house. ​
Picture
Julien Lawrence and Jeff Jardine - Site Visit to Kazakhstan